Hi,
I have a Synology RS812+ as our main file server which backs up using Hyperbackup to a second synology DS411+ using Hyper backup vault.
What I would like to do is schedule the DS411+ to turn on at a time, start the Hyperbackup process on the RS812+ and then shut down the DS411+ when the backup is complete.
Is this possible ?
If it is possible could someone please give me advice on how to do this ?
Thankyou.
Synology Hyper Backup Vault Batch Command
-
- Foren-Einsteiger
- Beiträge: 1
- Registriert: 31. Jan 2021, 10:18
© Home Server Blog · Streamline theme by StudioPress ·